NuVentrec

Guides / Lead-based paint disclosure

Guide · Deals and pipelines

Lead-based paint disclosure for investors: selling or renting a pre-1978 home, step by step.

If the house was built before 1978, a federal rule decides what the seller or landlord must hand over before the buyer or tenant is bound: a pamphlet, what you know about lead, a 10-day chance to test for buyers, and a signed attachment you keep for three years. Flips add a second rule for the renovation itself. Here is what 40 CFR 745 says, quoted.

By the NuVentrec team · Published October 29, 2026 · Sources last checked October 23, 2026 · General information, not legal advice

The short answer

  • Which homes: "target housing" is "any housing constructed prior to 1978", with narrow exceptions such as housing for the elderly and 0-bedroom units.
  • Before the contract binds: give the EPA-approved pamphlet, disclose any known lead-based paint or hazards, and hand over the reports you have.
  • Buyers get 10 days to test for lead, "unless the parties mutually agree, in writing, upon a different period", or they waive it in writing.
  • Sign and keep: the contract or lease carries a lead attachment with the Lead Warning Statement and signatures; keep it "no less than 3 years".
  • Getting it wrong costs: a knowing violator can owe the buyer or tenant "3 times the amount of damages", plus civil penalties.

Which sales and leases are covered

Section 745.101 says the subpart "applies to all transactions to sell or lease target housing, including subleases", except:

  • "Sales of target housing at foreclosure";
  • leases of housing a certified inspector found lead-based paint free;
  • "Short-term leases of 100 days or less, where no lease renewal or extension can occur";
  • renewals of existing leases where the landlord already disclosed and has no new information.

Target housing, in section 745.103, is "any housing constructed prior to 1978, except housing for the elderly or persons with disabilities or any 0-bedroom dwelling (unless any child who is less than 6 years of age resides or is expected to reside in such housing)." The build year is the first thing to check on every older house you buy, flip or rent out.

What the seller or landlord must do, and when

Section 745.107 lists what must happen "before the purchaser or lessee is obligated under any contract to purchase or lease target housing":

  1. The pamphlet. Give "an EPA-approved lead hazard information pamphlet", such as "Protect Your Family From Lead in Your Home".
  2. What you know. Disclose "the presence of any known lead-based paint and/or lead-based paint hazards", with what you know about where and why.
  3. The records. Provide the reports and records about lead in the home that you have or can reasonably get.
  4. Tell the agents too, if agents are involved.

The rule adds: "Nothing in this section implies a positive obligation on the seller or lessor to conduct any evaluation or reduction activities." You disclose what you know; you are not required by this subpart to test.

The buyer's 10 days

Section 745.110(a): "Before a purchaser is obligated under any contract to purchase target housing, the seller shall permit the purchaser a 10-day period (unless the parties mutually agree, in writing, upon a different period of time) to conduct a risk assessment or inspection for the presence of lead-based paint and/or lead-based paint hazards." Under (b), the buyer "may waive the opportunity" in writing. Leases have no testing period.

The attachment, and keeping it

Section 745.113 says each contract to sell target housing "shall include an attachment" with the Lead Warning Statement, which begins: "Every purchaser of any interest in residential real property on which a residential dwelling was built prior to 1978 is notified that such property may present exposure to lead from lead-based paint". The attachment also carries the seller's disclosure, the list of records provided, the buyer's acknowledgments and the signatures. Leases carry a similar attachment.

Retention: "The seller, and any agent, shall retain a copy of the completed attachment ... for no less than 3 years from the completion date of the sale." A landlord keeps it "no less than 3 years from the commencement of the leasing period."

Flips: the renovation rule

Renovating a pre-1978 home is covered by a different part of the same regulation. Section 745.81 says that since April 22, 2010, "no firm may perform, offer, or claim to perform renovations without certification from EPA" in target housing, unless an exception applies, and that "all renovations must be directed by renovators certified" under the rule. Ask every contractor on a pre-1978 flip for their EPA firm certification before work starts.

A worked example (made-up details)

A flipper buys a 1962 house, has an EPA-certified firm do the interior renovation, and lists it. The flipper has no lead test results. When a buyer signs, the contract carries the lead attachment: the Lead Warning Statement, "no known lead-based paint" from the seller, "no reports available", the buyer's acknowledgment of the pamphlet, and the buyer's choice of a 10-day inspection. All parties sign and date. The flipper saves the signed attachment and the contractor's certification on the deal, with a reminder to keep both for at least three years after closing.

Put it on the deal

  1. Year built on every property, so pre-1978 houses stand out.
  2. A closing step: pamphlet given, disclosure signed, 10-day period given or waived.
  3. The signed attachment and any lead reports as files on the deal.
  4. Contractor certification on any pre-1978 renovation.

For Texas's own seller disclosure, see the Texas seller's disclosure notice; to price the repairs, see the maximum allowable offer guide.

How this fits in NuVentrec today

NuVentrec properties take custom fields such as year built, deals carry a closing checklist and a property due diligence checklist you can extend, and signed documents upload to the contact or deal. Plans are on the pricing page.

Questions people ask

Do I need a lead paint disclosure for a house built before 1978?

Yes, for most sales and leases. 40 CFR 745 subpart F applies to housing built before 1978, with exceptions such as foreclosure sales, short leases of 100 days or less, housing for the elderly and 0-bedroom units.

Does the seller have to test for lead?

No. The rule says nothing in it implies an obligation to evaluate or reduce lead. The seller discloses what they know and the records they have, and gives the buyer a chance to test.

How long does a buyer have to test for lead?

Ten days before they are bound by the contract, unless both sides agree in writing on a different period, or the buyer waives it in writing.

How long must I keep the lead disclosure?

At least 3 years from the completion of the sale, or from the start of the lease for landlords.

Does my contractor need EPA certification to renovate a pre-1978 flip?

Under 40 CFR 745.81, firms renovating target housing need EPA certification and renovations must be directed by certified renovators, unless an exception applies.

Sources

  1. 40 CFR 745 subpart F, Disclosure of Known Lead-Based Paint (eCFR)
  2. 40 CFR 745.81, Effective dates (renovation rule) (eCFR)
  3. 42 U.S.C. 4852d, Disclosure of information concerning lead upon transfer of residential property (Legal Information Institute)

Year built, disclosures and signed papers on every deal.

Try the interactive demoBook a walkthrough
Call now